Flooring the power cable 69 kv

Project Details

Procedure after the trench has been excavated the respective current is lowered if the side of the ditch for the Land cable laying bed hidden 583 backhoe boom or a coil and which is non-glycosylated and unwind motion lifts PC220LC - 8 made with